and Engineering
Harlequin International was awarded a contract for the Tema LNG Terminal project in 2018. The scope of work was to provide Engineering, Procurement and Construction (EPC) services to Tema LNG Terminal Company for the engineering, procurement and construction of a Pressure Reducing and Metering Station and a 6.5km pipeline from the Leeside breakwater causeway at the Tema Port to the VRA Interconnecting Facility in Tema, Ghana
Client Name: Tema LNG Terminal Company
Year : 2022
Current Status of Project: Completed
Harlequin Oil and Gas Ltd manufactured two Suction Pile Tops including all Lower Skirt and Can Sections (subsea foundation for the Production Manifolds) for FMC Technologies (approx. 100 tons of steel).
Client Name: Tullow Oil Ghana Limited
Year : 2017
Current Status of Project: Completed
Harlequin Oil and Gas Ltd was contracted to fabricate seven (7) Foundation Mudmat Main Frame weldment, F/UTH, HDM & EDU fabrication, and Fourteen (14) Foundation, Mudmat Main frame weldment, F/UTH, with 12 Electrical and 4 parking fabrication for FMC Technologies Inc. (approx. 220 tons of steel)
Client Name: FMC Technologies
Year : 2015
Current Status of Project: Completed
C. 7,300 Sqm Lettable Commercial Offices
Client Name: CADS Developers
Year : 2013
Current Status of Project: Completed
c. 3,900 Sqm Lettable Commercial Offices
Client Name: CADS Contract and Services Ltd
Year : 2011
Current Status of Project: Completed
CADS Contract and Services Ltd provides Integrated Facilities Management Services including the following:
- General Repairs & Refurbishment
- Landscaping
- Waste Management
- Carpentry & Joinery
- HVAC Systems installation, maintenance and repair
- Carpentry Installation, maintenance and Repair
- Electrical Systems Installation, maintenance and Repair
- Plumbing Installation, maintenance & Repair
- Fit Out Services
Client Name: Tullow, Deloitte, Newmont, Huawei, Exim Bank, FDA
Year : N/A
Current Status of Project: N/A
CCADS Catering Services Ltd provides Catering and Housekeeping services including the following:
- Contract Catering
- Offshore Catering
- Events Catering
- Housekeeping
- Victuals
Client Name: Tullow, Valco, Yinson, Southey Contracting
Year : N/A
Current Status of Project: N/A
Harlequin provided Engineering, Procurement and Construction (EPC) services to re-habilitate and reinstate the 3Mpta Bibiani Mine Gold Processing Plant. The scope of work includes evaluation, procurement, refurbishment, repair and commissioning of the processing plant. The work consists of the following disciplines: earthworks, civil structures, sandblasting and painting, structural steel work, platework, rubber lining, mechanical component refurbishment, pipework, valves replacement, electrical and instrumentation etc. The project started in September 2021 and is expected to be completed in May 2022.
Client Name: Asante Gold
Status of Project: Completed
Year : 2022
CADS Constructed the Buildings, Road, and Pavements
The scope of work included the construction of 8 buildings and infrastructure including (roads and drainage)
- Admin 700m2
- Ablution 330m2
- Day care 390m2
- Auction Center 900m
- 4 fishing market (350m2 each (1400m2 Total)
Current Status of Project: Completed
Year : 2023
MCI has obtained a long-term license to undertake ship repair, shipbuilding, fabrication and various Shipyard services at Tema Shipyard.
Client Name: N/A
Year : N/A
Current Status of Project: N/A